Thursday, January 22, 2009

Almira Construction Projects - 1/22/09

Almira. The north end of Almira between Riddell Road and Fuson Road is only a half mile long road that is usually quiet and short cut for some going north to connect with Wheaton Way or State Highway 303. However, there are two new construction sites along that section of Almira that make the trip a little more exciting these days.

Keller House. The first is utility work and clearing on the west side of Almira for the Keller House project next to and part of the Kitsap Mental Health facility. The land was donated by Kitsap County in 2007. Some of the work was on the east side of the road next to the Illahee Preserve where a curtain drain was installed that takes water coming from the Preserve and directs it to a culvert under Almira where it becomes a small seasonal stream that flows between the new Keller House and the existing mental health facilities. The first two attached photos are of the Keller House project.

Preserve Parking Lot. The second set of photos are of the other construction site that is on the east side of Almira across from the Kitsap Recovery Center. The site is being cleared is for the Preserve parking lot which is scheduled to complete in about 6 weeks (early March 2009).

Jim Aho

No comments:

Post a Comment